16” Tpu Layflat hose successfully shipped to Canada though the bad Covid-19 Epidemic
12th,March,2022,SUNMOON finisehd the 2 containers 16” and 12” TPU layflat hose production and packing within 20 days and shiiped them on time in spite of the heavy Epidemic of Covid-19. we overcome the many diddiculties and let cargoes left Chnia from the Zhejiang Ningbo Port. this batch of cargo includes the many size of Flange connector and Victaulic couplings. we can do is hoping our cargo arrived Canada AS soon as possible and used in the oilgas water transfer !
Post time: Apr-15-2022